GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW) | ||||||
---|---|---|---|---|---|---|
|
12:05 Apr 7, 2019 |
Polish to English translations [PRO] Tech/Engineering - Construction / Civil Engineering / hydrotechnika | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: Jacek Kloskowski United States Local time: 11:03 | ||||||
Grading comment
|
Summary of answers provided | ||||
---|---|---|---|---|
3 +1 | shaft chamber |
|
Discussion entries: 4 | |
---|---|
shaft chamber Explanation: Shaft and Meter Chamber The original design proposed in the Final SEIS included construction of a new Shaft Chamber constructed in the Harris Park Annex, which is City property and not mapped as parkland, approximately 130 feet northeast of Gate House No. 5 containing a single vertical shaft approximately 30 feet in diameter which would contain two riser shafts, one for Low Level Service and one for High Level Service. The new Shaft Chamber would provide a central point for distributing treated water from the Croton WTP to the High Level and Low Level services in the Bronx. Treated water would be conveyed to the single shaft from the Croton WTP by a new combined treated water tunnel containing both a 7-foot diameter High Level Service treated water pipe and a 9-foot diameter Low Level Service treated water pipe. https://www1.nyc.gov/html/dep/pdf/croton/minor_modification.... |
| |
Grading comment
| ||
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.