GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW) | ||||||
---|---|---|---|---|---|---|
|
09:06 Nov 2, 2020 |
English to Arabic translations [PRO] Tech/Engineering - Construction / Civil Engineering | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: Z-Translations Translator Local time: 08:23 | ||||||
Grading comment
|
Summary of answers provided | ||||
---|---|---|---|---|
5 | أعمال الشدات الخشبية (طوبار) نوع جانج للحوائط |
| ||
5 | نظام قوالب صب الخرسانة للحوائط (أو الجدران) |
|
GANG WALL FORM SYSTEM أعمال الشدات الخشبية (طوبار) نوع جانج للحوائط Explanation: SHEARWALL FORM SYSTEM أعمال الشدات الخشبية لحائط الشير (حائط حامل للاحمال الجانبية TOWER 1: SHEARWALL FORM برج رقم 1 اعمال الشدات الخشبية لحائط الشير SW5&SW6 حائط الشير رقم 5 وحائط الشير رقم 6 Rental Period: February 01-15, 2019 Rental Period: February 16-28, 2019 TOWER 2: SHEARWALL FORM SW10 & SW11 Rental Period: February 01-15, 2019 Rental Period: February 16-28, 2019 TOWER 3: SHEARWALL FORM SW20, SW22 & SW23 Rental Period: February 01-15, 2019 Rental Period: February 16-28, 2019 GANG WALL FORM SYSTEM نظام الشدات الخشبية نوع جانج للحوائط TOWER 1: COREWALL FORM برج رقم 1 الشدات الخشبية للكورول أو صندوق المصعد الترجمة كانت كل سطر انكليزي تحته العربي وفقط للغير مكرر والباقي على نفس النمط اذا كانت كلمة اعمال الشدات الخشبية غير مفهومة استبدليها بالطوبار او حتى بكلمة فورمورك دنت امك دعيالك |
| |
Login to enter a peer comment (or grade) |
gang wall form system نظام قوالب صب الخرسانة للحوائط (أو الجدران) Explanation: Gang Form means large-sized Formwork used on the structure of the same up and down surface, manufacturing scaffold cage for installing and disassembling external wall Formwork, plastering and decorating as an integrated system. it is taken to prevent thoroughly outer wall’s frame quality of apartment and general building from arising and consecutively construct framework and following finishing work of high rise building with equal quality. Gang forms are several unit forms attached together, or a single large form, usually moved into position by crane because sections are too heavy to set by hand. The length of a gang form for walls is often determined by the distance between control joints or by the capacity of the job site crane. Reference: http://s-form.co.kr/page/products02.html#:~:text=Gang%20Form... https://www.concreteconstruction.net/products/concrete-construction-equipment-tools/working-with-gang-forms_o |
| |
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.