Well de-risking and pre-drill activities

Spanish translation: reducción de riesgos de pozo y actividades previas a la perforación

GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW)
English term or phrase:Well de-risking and pre-drill activities
Spanish translation:reducción de riesgos de pozo y actividades previas a la perforación
Entered by: Maria Andrade

05:08 Jan 18, 2015
English to Spanish translations [PRO]
Tech/Engineering - Petroleum Eng/Sci
English term or phrase: Well de-risking and pre-drill activities
Geothechnical Services

■ Onshore and offshore geotechnical site investigations
■ Cone penetration testing (CPT)
■ Well de-risking and pre-drill activities
■ Geotechnical engineering and consultancy
■ Laboratory testing of soils and rocks
■ Nondestructive testing
■ Load testing
Maria Andrade
Local time: 09:23
reducción de riesgos de pozo y actividades previas a la perforación
Explanation:
En este contexto el termino "activities" solo se refiere a "pre-drill".

Te dejo a continuación un ejemplo y en las referencias el enlace correspondiente:


...
- Subsea and well activity
- Conductor and casing installation
- Well de-risking
- Pre-drill activities
- Well decommissioning and abandonment
....

Espero que te sea útil
Saludos
Selected response from:

Constanza Toro
Argentina
Local time: 12:23
Grading comment
gracias
4 KudoZ points were awarded for this answer



Summary of answers provided
5reducción de riesgos de pozo y actividades previas a la perforación
Constanza Toro
5Actividades de prevención de riesgos y previas a la perforación de pozos
Cecilia Vela Segovia-Frund, CT
4Análisis y remoción/eliminación de riesgos en pozos en tierra firme y costa fuera.......(ver texto)
lugoben
3actividades de eliminación/prevención de riesgos y previas a la perforación de pozos (de petróleo)
Mónica Algazi


  

Answers


5 hrs   confidence: Answerer confidence 3/5Answerer confidence 3/5
well de-risking and pre-drill activities
actividades de eliminación/prevención de riesgos y previas a la perforación de pozos (de petróleo)


Explanation:
o pre-perforación de los pozos de petróleo.

Mónica Algazi
Uruguay
Local time: 12:23
Native speaker of: Native in SpanishSpanish
PRO pts in category: 40
Login to enter a peer comment (or grade)

15 hrs   confidence: Answerer confidence 4/5Answerer confidence 4/5
well de-risking and pre-drill activities
Análisis y remoción/eliminación de riesgos en pozos en tierra firme y costa fuera.......(ver texto)


Explanation:
Análisis y remoción/eliminación de riesgos en pozos en tierra firme y costa fuera y actividades de pre-perforación(término completo)

Fundamentos de Perforación Costa Afuera

Instructor:
Ing. Carlos Antepara
Objetivos:
• Conocer las características básicas de equipos utilizados en la perforación y terminación de los pozoscosta afuera.
http://www.buenastareas.com/ensayos/Perforacion-De-Pozos-Cos...

En producción de crudo en costa afuera. 6° En producción ... Pozos en explotación. 6,080. Plataformas ..... Identificación y evaluación del riesgo. 2. ... Eliminar los riesgos o bien, aplicar controles hasta lograr que estos sean tolerables. 8.
http://www.veracruz.gob.mx/.../Analisis-de-riesgos-y-program... instalaciones-de-PEMEX.pdf.

De-risking
The fine art of removing danger or unwanted consequences from a situation. Covering your ass at a sophisticated level.
www.urbandictionary.com/define.php?term=de-risking

Applying our core drilling knowledge and experience, we install and construct the shallow section of subsea wells and seafloor infrastructure. We add maximum value in ‘well work’ areas such as:

Subsea and well activity
Conductor and casing installation
Well de-risking
Pre-drill activities
Well decommissioning and abandonment
http://www.fugro.com/our-expertise/our-services/geotechnical...




lugoben
Local time: 11:23
Works in field
Native speaker of: Spanish
PRO pts in category: 36
Login to enter a peer comment (or grade)

1 day 5 hrs   confidence: Answerer confidence 5/5
well de-risking and pre-drill activities
reducción de riesgos de pozo y actividades previas a la perforación


Explanation:
En este contexto el termino "activities" solo se refiere a "pre-drill".

Te dejo a continuación un ejemplo y en las referencias el enlace correspondiente:


...
- Subsea and well activity
- Conductor and casing installation
- Well de-risking
- Pre-drill activities
- Well decommissioning and abandonment
....

Espero que te sea útil
Saludos



    Reference: http://www.fugro.com/our-expertise/our-services/geotechnical...
Constanza Toro
Argentina
Local time: 12:23
Specializes in field
Native speaker of: Spanish
PRO pts in category: 1177
Grading comment
gracias
Login to enter a peer comment (or grade)

1 day 13 hrs   confidence: Answerer confidence 5/5
well de-risking and pre-drill activities
Actividades de prevención de riesgos y previas a la perforación de pozos


Explanation:
Estoy de acuerdo con las traducciones de Mónica y Constanza, creo que faltaba detallar lo que aporta la geotecnia a la etapa previa a la perforación de un pozo hidrocarburífero. Tomo esta descripción de una página venezolana, que sirve de sustento al término:


Ingeniería – Geotecnia
Site Characterization
􀂃Identificación y caracterización del substrato. Profundidad bedrock, “rippability”, estabilidad-integridad.
􀂃Riesgos geológicos, identificación, monitoreo y su análisis espacial (fallas, fracturas-diaclasas, deslizamientos, estabilidad de pendientes, zonas de socavación...).
􀂃Estudios de parámetros elásticos para fundaciones
􀂃Zonificación y re-calificación sísmica de sitios
􀂃Estudios de resistividad del suelo para definición de tierras de infraestructuras eléctricas y diseño de protecciones catódicas de tuberías.
􀂃Investigaciones geofísicas en ríos-lagos (magnetismo, GPR, resistividad, sísmica)
􀂃Exploración y caracterización de material inerte y no, para la construcción (grava, arena, ..), material impermeable y calculo del volumen de la cobertura para préstamos...
􀂃Identificación de cavidades naturales, zonas de hundimiento del terreno, excavaciones (minas) y túneles.



    Reference: http://caracasprueba1.com/info_pdf/hidrocarburosf681131516aa...
Cecilia Vela Segovia-Frund, CT
Argentina
Local time: 12:23
Specializes in field
Native speaker of: Native in SpanishSpanish
PRO pts in category: 11
Login to enter a peer comment (or grade)



Login or register (free and only takes a few minutes) to participate in this question.

You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.

KudoZ™ translation help

The KudoZ network provides a framework for translators and others to assist each other with translations or explanations of terms and short phrases.


See also:
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search