GLOSSARY ENTRY (DERIVED FROM QUESTION BELOW) | ||||||
---|---|---|---|---|---|---|
|
14:52 Oct 3, 2010 |
Serbo-Croat to English translations [PRO] Tech/Engineering - Electronics / Elect Eng | |||||||
---|---|---|---|---|---|---|---|
|
| ||||||
| Selected response from: Natasa Stankovic Serbia Local time: 06:07 | ||||||
Grading comment
|
Summary of answers provided | ||||
---|---|---|---|---|
4 | set of fuses |
|
set of fuses Explanation: At the design stage, the maximum permitted lengths of cable downstream of a protective circuit-breaker (or set of fuses) must be calculated, while during the installation work certain rules must be fully respected. http://www.google.com/url?sa=t&source=web&cd=1&ved=0CBUQFjAA... For Customer installations of two to six breakers, or set of fuses, on the load side of a termination box, or current transformer cabinet, the sum of the ratings of the circuit breakers, or fuses will be permitted to exceed the rating of the termination box or instrument transformer cabinet provided the load is calculated in accordance with the NEC Article 220. http://wlp.waverlyia.com/webres/file/about/Waverly Light and... |
| |
Grading comment
| ||
Login to enter a peer comment (or grade) |
Login or register (free and only takes a few minutes) to participate in this question.
You will also have access to many other tools and opportunities designed for those who have language-related jobs (or are passionate about them). Participation is free and the site has a strict confidentiality policy.