Jul 26, 2020 16:00
3 yrs ago
14 viewers *
Norwegian term
montasjehall
Norwegian to English
Tech/Engineering
Construction / Civil Engineering
Water supply construction
Råvannstunnelen fra Vefsrud går på synk fra 221 TBM montasjehall Vefsrud til gjennomslag mot 240 Råvannstunnel fra Huseby.
Proposed translations
(English)
3 +1 | assembly hall | liz askew |
Proposed translations
+1
8 mins
Selected
assembly hall
Search Results
Web results
To Build a Tunnel Boring Machine: Why Assembly on Location ...www.therobbinscompany.com › 13_OFTA_UDCC15
PDF
Traditionally, tunnel boring machine components have been shipped to a large assembly hall, assembled, tested, disassembled, transported to the job site and ...
People also ask
--------------------------------------------------
Note added at 9 mins (2020-07-26 16:09:48 GMT)
--------------------------------------------------
Onsite, First Time Assembly of TBMs - The Robbins Companywww.therobbinscompany.com › OFTA_NAT_2010
PDF
ABSTRACT: Traditionally, the delivery of Tunnel Boring Machines (TBMs) has been preceded by full ... of TBM delivery has been developed called Onsite First Time Assembly (OFTA). ... in the onsite assembly hall, ready to walk to the face.
by J Roby - Cited by 1 - Related articles
--------------------------------------------------
Note added at 13 mins (2020-07-26 16:13:45 GMT)
--------------------------------------------------
Key $1.1 billion TBM tunnel contract is awarded for Norway's ...tunnellingjournal.com › main-tunnel-contract-awarded-...
4 Mar 2015 - In the assembly halls, four TBMs – each with a diameter of less than ten meters – will be assembled and launched. The machines will be used ...
I started with google translate and found "Assembly Hall". No knowledge at all of the subject.
Web results
To Build a Tunnel Boring Machine: Why Assembly on Location ...www.therobbinscompany.com › 13_OFTA_UDCC15
Traditionally, tunnel boring machine components have been shipped to a large assembly hall, assembled, tested, disassembled, transported to the job site and ...
People also ask
--------------------------------------------------
Note added at 9 mins (2020-07-26 16:09:48 GMT)
--------------------------------------------------
Onsite, First Time Assembly of TBMs - The Robbins Companywww.therobbinscompany.com › OFTA_NAT_2010
ABSTRACT: Traditionally, the delivery of Tunnel Boring Machines (TBMs) has been preceded by full ... of TBM delivery has been developed called Onsite First Time Assembly (OFTA). ... in the onsite assembly hall, ready to walk to the face.
by J Roby - Cited by 1 - Related articles
--------------------------------------------------
Note added at 13 mins (2020-07-26 16:13:45 GMT)
--------------------------------------------------
Key $1.1 billion TBM tunnel contract is awarded for Norway's ...tunnellingjournal.com › main-tunnel-contract-awarded-...
4 Mar 2015 - In the assembly halls, four TBMs – each with a diameter of less than ten meters – will be assembled and launched. The machines will be used ...
I started with google translate and found "Assembly Hall". No knowledge at all of the subject.
4 KudoZ points awarded for this answer.
Something went wrong...