Jul 14, 2011 04:31
12 yrs ago
Chinese term

工程契约无单价分析表者

Chinese to English Tech/Engineering Engineering: Industrial
工程契约详细价目表式者,依照完成比例计算,工程契约无单价分析表者,得有开发商提松单价分析表经本公司审定后,依照完工成部分分项计价。

project contract analysis table??

Discussion

Ambrose Li Jul 14, 2011:
I don’t know what a 单价分析表 is.

However, as a whole, it should mean something to the effect of “For those projects whose contract does not include a 单价分析表”

Proposed translations

4 hrs

a project contract that does not include a unit price analysis form

I've also found some websites that use "unit rate analysis."

Anyway, I think the phrase refers to a project contract that does not come with a unit price analysis form
Something went wrong...
33 days

for the project contract without cost breakdown sheets

单价分析表,指的是价目(各项目单价)之分析比较。亦即,投标厂商投标单中的各项单价,对招标单位而言,是成本。故,在使用英文系国家中的标案,将之称为「cost」。
其亦可称为:
cost breakdown and comparison sheets.
请参见如下各国网站招标文件案例:

for the project contract without cost breakdown sheets
Example sentence:

To prepare cost breakdown and comparison sheet. To do documentation and submission of tender. To attend tender interview and site show round ...

The cost breakdown sheet first listed "Demolition & Removal" and .... However, Yanoff does not tender sufficient evidence to .....

Something went wrong...
Term search
  • All of ProZ.com
  • Term search
  • Jobs
  • Forums
  • Multiple search